For the last two weeks our group have been creating our characters and set for our animation. This required alot of hard work and planning, we had to make sure that our character was in proportion with the set as well as maintaining a thought through idea. Once our set and character were made we could begin work on our final project. This was only made possible because of our idea being finished. Idea meaning that all the pre-production was at a good standard. All storyboards scripts and other things had to be 100 percent finished; which they were. We had two days for our scheduled filming and on each day we worked hard to make sure that we finished on time. The hardest thing we found when carrying out our project was the amount of attention to detail that was needed throughout and being complacent could not be tolerated. After the first day we managed to have completed a third of the animation leaving alot of work to do for the second day.